MT1 Media
Photo and video galleries
showcasing MT1 progression.

Decked logs across the MT1 landscape

Day 1 of logs being placed in the MT1 chamber

10M lbs. of fire-killed trees loaded in chamber

First layer of cap being laid and compacted

Cap complete with topsoil; MRV install begins

MRV installation complete






Satellite imagery over MT1 (2021 to 2023)
Decked logs staged for burial; loading begins
Local Montana operator, Cody, weighs biomass
Mast VP Lisa gives MT1 overview
Elk passing through MT1
MT1 from start to finish
Biomass burial funds reforestation and cone collection








Cone collections at MT1

MRV installed at MT1

MRV being installed

Gravel layer place on cap of chamber

Compacting first layer of cap


10M lbs. of fire-killed trees loaded in chamber

1.1 acre chamber full with biomass

Day 2 of loading fire-killed trees into chamber


Day 1 of loading fire-killed trees into chamber

MT1 mascot Max next to 20ft chamber wall

Forester Rich testing the weight sensor

Operator Cody recording log weight data

Fire-killed trees being loaded

Decked logs being brought to the scale by skidder

Coring trees to send to moisture analysis lab

Standing dead trees damaged by recent windstorm

(Left) Neighboring untreated property | (Right) MT1

Decked fire-killed trees ready to be staged at chamber

Beginning excavation of burial chamber

Satellite image of decked logs at MT1