MT1 Media
Photo and video galleries
showcasing MT1 progression.
Decked logs across the MT1 landscape.
Day 1 of logs being placed in the MT1 chamber
10M lbs. of fire-killed trees loaded in chamber
First layer of cap being laid and compacted
Cap complete with topsoil; MRV install begins
MRV installation complete
Satellite imagery over MT1 (2021 to 2023)
Decked logs staged for burial; loading begins
Local Montana operator, Cody, weighs biomass
Mast VP Lisa gives MT1 overview
Elk passing through MT1
MT1 from start to finish
Biomass burial funds reforestation and cone collection
Cone collections at MT1
MRV installed at MT1
MRV being installed
Gravel layer place on cap of chamber
Compacting first layer of cap
10M lbs. of fire-killed trees loaded in chamber
1.1 acre chamber full with biomass
Day 2 of loading fire-killed trees into chamber
Day 1 of loading fire-killed trees into chamber
MT1 mascot Max next to 20ft chamber wall
Forester Rich testing the weight sensor
Operator Cody recording log weight data
Fire-killed trees being loaded
Decked logs being brought to the scale by skidder
Coring trees to send to moisture analysis lab
Standing dead trees damaged by recent windstorm
(Left) Neighboring untreated property | (Right) MT1
Decked fire-killed trees ready to be staged at chamber
Beginning excavation of burial chamber
Satellite image of decked logs at MT1